Replaced AC subpanel on accomodation level
Replaced two x 3-phase power feeds to accomodation level subpanel
All AC wiring replaced on accomodation level
Replaced 24V DC subpanel in engine room
Added 24V DC subpanel in lazarette
Replaced 24V DC battery charger in engine room
Removed all unused cable from cable trays
Replace steel cable trays in engine room with aluminum hangers
Added 2 50A 240V Glendinning cable masters
Replaced all DC wiring in engine room